Town house renovation, Peguera

  • Completed 2022
  • 315 m² built
  • 5 bedrooms
  • 3 bathrooms
  • Garden and pool

A detached town house in Peguera, on the south west coast, renovated with modern finishes while keeping its Majorcan stone walls.

The brief

During the pandemic, a buyer based in Germany had bid on the house after seeing it only online. Travel was restricted, and the client needed to know quickly whether the bid was a sound decision.

My role

I surveyed the property the same day as the call, in March 2021, as part of my checks before buying, and reported the findings straight away. With that reassurance the client kept the bid, which was accepted. I then managed the full renovation for the owner abroad as project manager, from the first strip out in May 2021 to the finished house in spring 2022, with the gates and the garden completed later that year.

The result

  • Exposed stone walls kept and lit in the living room and bathroom.
  • An open plan kitchen with white handleless units, an oak breakfast bar and raw timber shelving.
  • A fireside corner in the living area.
  • Original teak shutters and windows restored.
  • Large format floor tiles, walk in showers and wall hung WCs.
  • Air conditioning throughout, with split units in each main room.

The house was also fully rewired with a new consumer unit and protection on every circuit, data and TV points and satellite TV. Outside, the front wall, the garden retaining wall and the drainage were rebuilt, the gates were automated, and stone paths, an outdoor shower and garden lighting were added around the pool. I still look after the house.

During the works

Site photos from May 2021 to November 2022.

Kitchen and dining room before the works
Kitchen and dining room before
Upstairs living room before the works
Upstairs living room before
Tiles and partitions coming out on the ground floor
Strip out begins on the ground floor
Old partitions demolished
Old partitions demolished to open up the plan
Ground floor strip out
Strip out of the ground floor, May 2021
New brickwork and chases marked for services
New brickwork and chases for the new layout
The new kitchen wall going up
The new kitchen wall going up
Setting out the new layout by laser
New layout set out by laser
Walls chased for the rewire
Full rewire, walls chased
Temporary site supply board
Temporary supply set up before the full rewire
Metal stud partitions and plasterboard upstairs
Metal stud partitions and plasterboard upstairs
The new ceiling frame upstairs
The new ceiling frame upstairs
New steel beam over a wider opening
Steel beam for a wider opening
Timber doors and air conditioning fitted
Timber doors and air conditioning
New drainage channel in fresh concrete
New drainage channel set into fresh concrete
New drainage under a bathroom floor
New drainage under the bathrooms
Retaining wall rebuilt in concrete block
Retaining wall rebuilt in block, tied to the old stone
Wiring the new consumer unit
Wiring the new consumer unit
New consumer unit
New consumer unit, every circuit labelled
A new concrete chamber in the garden
A new concrete chamber cast in the garden
Spray painting the interiors
Interiors spray painted, March 2022
The new kitchen fitted
The new kitchen in, days before handover
Walls meshed and primed before tiling
Walls meshed and primed before tiling
New water manifold in the plant room
New water supply in the plant room
Stone garden path and lighting going in
Stone path and garden lighting going in